Bad Plumbing

I got to work on the CO2 plumbing on Missouri this week. I am happy to report that it is back to the same functional level that it was prior to last year's catastrophe. Unfortunately, after working to lubricate the forward magazine plungers, I have determined that the original CO2 layout will need to be changed. I do not (currently) have the parts to make those changes (They are with the pending Group Order). Once I have those in hand, I should be able to get the guns firing at full pressure. In the mean time, I will start working on reassembling the electrical and control systems (starting with making sure my prop shafts are in good working order, and properly lubricated).

0
Your rating: None